Site 10 is the most northern site in the Volusia County artificial reef system, approximately 10 nm offshore of Ormond Beach. The site is 17.2 nm from the Bell Buoy at a bearing of 012° with a depth of 65-70 ft. Site 10 always has a wide variety of fish.
1998 - Site 10 Center Piles of Concrete (V10-98C5)
DD MM.MMM: 29°21.460', -080°49.770'
DD.DDDDDD: 29.357667°, -080.829500°
In 1998, the first barge load of concrete material from DOT was placed near the center of the site. These piles are 5-10 feet high. In 1999, a barge load of concrete material was also placed a short distance south of the 1998 deposit.
2003 - Site 10 NorthEast Pile (V10-03NE3)
DD MM.MMM: 29°21.560', -080°49.650'
DD.DDDDDD: 29.359333°, -080.827500°
2003 - Site 10 SE Deposit (V10-03SE3)
DD MM.MMM: 29°21.350', -080°49.670'
DD.DDDDDD: 29.355833°, -080.827833°
In June 2003, two separate 15 ft. piles of culverts (300 tons each) were deposited to the northeast and southeast of the center pile.
2010 - Site 10 NW Pile (V10-10NW3)
DD MM.MMM: 29°21.638', -080°49.966'
DD.DDDDDD: 29.360633°, -080.832767°
In August 2010, a barge load of clean culverts and concrete was placed on the northwest part of the site. The depth of the deposit is 65 ft. and the height is 14 ft.
2011 - Site 10 South Deposit (V10-11S3)
DD MM.MMM: 29°21.199', -080°49.753'
DD.DDDDDD: 29.353317°, -080.829217°
On June 7, 2011, a barge load of clean culverts was placed on the south part of the site. The depth of the pile is 65 ft. and the height is approx. 14 ft.
2012- Site 10 West Deposit (V10-12W3)
DD MM.MMM: 29°21.430', -080°49.978'
DD.DDDDDD: 29.357167°, -080.832967°
On August 12, 2012, a barge load of clean culverts and material was placed on the western part of the site. The depth of the deposit is approximately 65 ft. and the height is approx 10 ft. The length is 80 ft.
2013 - Site 10 SSE Deposit (V10-13SSE3)
DD MM.MMM: 29°21.159', -080°49.465'
DD.DDDDDD: 29.352650°, -080.824417°
On June 22, 2013, a barge load of clean culverts was placed on the south-southeast part of the site. The depth is approximately 65 ft. The height of the pile is approx 9 ft.
2013 - Site 10 North Deposit (V10-13N3)
DD MM.MMM: 29°21.740', -080°49.745'
DD.DDDDDD: 29.362333°, -080.829083°
On June 27, 2013, a barge load of clean culverts was placed on the northern part of the site. The depth is approximately 65 ft. The height of the pile is approx. 9 ft.
2013 - Site 10 NNE Deposit (V10-13NNE3)
DD MM.MMM: 29°21.731', -080°49.447'
DD.DDDDDD: 29.362183°, -080.824117°
On July 31, 2013, a barge load of clean culverts was placed on the north-northeast part of the site. The depth is approximately 65 ft. The height of the pile is approx. 15 ft.
2013 - Site 10 NW Deposit (V10-13NNW3)
DD MM.MMM: 29°21.735', -080°50.063'
DD.DDDDDD: 29.362250°, -080.834383°
On August 12, 2013, a barge load of clean culverts was placed on the northwest part of the site. The depth is approximately 65 ft. The height of the pile is approx. 15 ft.
2014 - Site 10 SW Deposit (V10-14SW3)
DD MM.MMM: 29°21.169', -080°50.076'
DD.DDDDDD: 29.352817°, -080.834600°
On September 7, 2014, a barge load of 360 tons of clean culverts was placed on the southwest part of the site. The depth is approximately 68 ft. The height of the pile is approx. 13 ft.
2014 - Site 10 SE-B Deposit (V10-14ESE3)
DD MM.MMM: 29°21.346', -080°49.459'
DD.DDDDDD: 29.355767°, -080.824317°
On September 9, 2014, a barge load of 350 tons of clean culverts was placed on the southeast part of the site. The depth is approximately 63 ft. The height of the pile is approx. 10 ft.